Client: Portico Inv

Office and retail center , 2S+ P + 2E+ 5E

  • Infrastructure (excavation, exterior landscaping, foundations)
  • Assembly of steel structure
  •  Roof and façade enclosures with insulating panels
  •  Interior and exterior plumbing works for water and sewer system
  •   Exterior aluminum joinery
  •  Interior works designated for cooling areas • Industrial floors
  •  Electrical and low-voltage cabling
  • Execution period: 24 months