Client: Portico Inv
Office and retail center , 2S+ P + 2E+ 5E
- Infrastructure (excavation, exterior landscaping, foundations)
- Assembly of steel structure
- Roof and façade enclosures with insulating panels
- Interior and exterior plumbing works for water and sewer system
- Exterior aluminum joinery
- Interior works designated for cooling areas • Industrial floors
- Electrical and low-voltage cabling
- Execution period: 24 months