Client: One Herastrau Plaza SRL
Project descripstion: Retail and compound building, 2S + P + 7E +8Duplex
Execution period: 9 months – infrastructure and structure
“Turn-key” – end 2018
Client: Private Owner
Apartment building S+P+ 5E+6R
- • Infrastructure – foundations and basement
- • Suprastructure
- • Installations
- • Interior finishes: walls, floors
- • Exterior finishes.Execution period 12 months
Client: Prima SRL
Aparment building 3x P+9E
- • Infrastructure – foundations and basement
- • Suprastructure
- • Installations
- • Interior finishes: walls, floors
- • Exterior finishes.
Execution period: 24 months
Client: Prima SRL
Aparment building with retail spaces at ground floor, P+6E
- • Infrastructure – foundations and basement
- • Suprastructure
- • Installations
- • Interior finishes: walls, floors
- • Exterior finishes.Execution period: 12 months
Client : Private Owner
Hotel President expansion with the new building S+P+4E
- • Infrastructure – foundations and basement
- • Suprastructure
- • Installations
- • Interior finishes: walls, floors
- • Exterior finishes.Execution period : 12 months
Client: Private Owner
Apartment building 2x D+P+4E
- infrastructure
- suprastructure
Execution period : 8 months
Client: Portico Inv
Office and retail center , 2S+ P + 2E+ 5E
- Infrastructure (excavation, exterior landscaping, foundations)
- Assembly of steel structure
- Roof and façade enclosures with insulating panels
- Interior and exterior plumbing works for water and sewer system
- Exterior aluminum joinery
- Interior works designated for cooling areas • Industrial floors
- Electrical and low-voltage cabling
- Execution period: 24 months
Client: Private owner, EU funding
- • Infrastructure – foundations and basement
- • Superstructure
- • Installations
- • Interior finishes: walls, floors
- • Exterior finishes.
- Execution period: 18 months, finished 2013
Client: Prima SRL
Aparment building with retail spaces at ground floor P+9E
- • Infrastructure – foundations and basement
- • Suprastructure
- • Installations
- • Interior finishes: walls, floors
Execution period: 18 months